Discover the CMC 300

Mobile Saturation Diving System
Number of Divers = 12
Deep under water max = 300 msw
Main chamber for 6 divers
Additional chamber for 3 divers with entrance lock
TUP connected with chambers
Hyperbaric Rescue Chamber (3/12 divers)
DNV certification
Delivery time : 12 months

PDF Documents :

Diving Bell 3 men

Diving Bell 3 men

Boiled and Welded Chambers

Boiled and Welded Chambers

Flange and A frame

Flange and A frame

Workshop and parts of chambers

Workshop and parts of chambers

Ultrason control

Ultrason control

Diving bell before painted

Diving bell before painted

External hydrostatic test

External hydrostatic test

External test pressure

External test pressure

Chambers and structure on progress

Chambers and structure on progress

Additional chamber

Additional chamber

Main and Emergency power pack

Main and Emergency power pack

HRC and launching system

HRC and launching system

TUP and Main Chamber

TUP and Main Chamber

Insulated additional chamber

Insulated additional chamber

Guide line winches

Guide line winches

TUP and Main Chamber

TUP and Main Chamber

Control Gas inside diving bell

Control Gas inside diving bell

Top of A Frame

Top of A Frame

Diving Bell 3 men

Diving Bell 3 men

Medical lock on Diving Bell

Medical lock on Diving Bell

HRC and launching system

HRC and launching system

Integration - Hot and Cold Fluid

Integration - Hot and Cold Fluid

Integration - Main Chamber on progress

Integration - Main Chamber on progress

Diving Bell on trolley under A frame

Diving Bell on trolley under A frame

Clamp between TUP and HRC

Clamp between TUP and HRC

SAT system CMC300 on progress

SAT system CMC300 on progress

Winches on position

Winches on position

SAT control on progress

SAT control on progress

Sea Water Heater

Sea Water Heater

SAT control

SAT control

Inside Main Chamber - 6 divers

Inside Main Chamber - 6 divers

Door between Main chamber and TUP

Door between Main chamber and TUP

Inside HRC

Inside HRC

HRC launching system - position before launching

HRC launching system - position before launching

SAT control OK

SAT control OK

SAT system CMC300 during DNV test

SAT system CMC300 during DNV test

Diving Bell clamp - TUP

Diving Bell clamp - TUP

Remote control inside Dive Control Container

Remote control inside Dive Control Container

Diving Communication

Diving Communication

SAT system CMC300 on top

SAT system CMC300 on top

A frame and Bell clamp

A frame and Bell clamp

HRC test - stability approved

HRC test - stability approved

DNV control

DNV control

SAT system CMC300 during DNV test

SAT system CMC300 during DNV test

A Frame structure for shipment and quick mobilization

A Frame structure for shipment and quick mobilization

Départure from CMC Industries to Dubai

Départure from CMC Industries to Dubai

Main Chamber

Main Chamber

On port before départure

On port before départure

  • Diving Bell 3 men
  • Boiled and Welded Chambers
  • Flange and A frame
  • Workshop and parts of chambers
  • Ultrason control
  • Diving bell before painted
  • External hydrostatic test
  • External test pressure
  • Chambers and structure on progress
  • Additional chamber
  • Main and Emergency power pack
  • HRC and launching system
  • TUP and Main Chamber
  • Insulated additional chamber
  • Guide line winches
  • TUP and Main Chamber
  • Control Gas inside diving bell
  • Top of A Frame
  • Diving Bell 3 men
  • Medical lock on Diving Bell
  • HRC and launching system
  • Integration - Hot and Cold Fluid
  • Integration - Main Chamber on progress
  • Diving Bell on trolley under A frame
  • Clamp between TUP and HRC
  • SAT system CMC300 on progress
  • Winches on position
  • SAT control on progress
  • Sea Water Heater
  • SAT control
  • Inside Main Chamber - 6 divers
  • Door between Main chamber and TUP
  • Inside HRC
  • HRC launching system - position before launching
  • SAT control OK
  • SAT system CMC300 during DNV test
  • Diving Bell clamp - TUP
  • Remote control inside Dive Control Container
  • Diving Communication
  • SAT system CMC300 on top
  • A frame and Bell clamp
  • HRC test - stability approved
  • DNV control
  • SAT system CMC300 during DNV test
  • A Frame structure for shipment and quick mobilization
  • Départure from CMC Industries to Dubai
  • Main Chamber
  • On port before départure