Equipment for hydroelectric maintenance - 1

Equipment for hydroelectric maintenance

Construction of a working floor to dismantle hydroelectric dam turbines + storage trolleys of the floor.

Characteristics :

  • 7 m diameter
  • support on 12 anchorages at the periphery
  • service load 12 tons
  • central deflection of 48 mm for the maximum load
  • can be unfolded by 2 persons from a confined watertight door (800mm x 600mm).
Equipment for hydroelectric maintenance - 1
Equipment for hydroelectric maintenance - 1